Request for Proposals RFP No. 25-09 Yuba College, Electrical Distribution System, Architectural and Engineering Services Status: Proposals Due July 22, 2025, 1:00PM Sharp
RFP 25-09 YC Electrical Dist. Systems, Phase I, Design Services, MS Word Format
RFP 25-09 YC Electrical Dist. Systems, Phase I, Design Services, PDF Format
Yuba College, Electrical Distribution System Risk Matrix and Assessment Link:
https://goyccd-my.sharepoint.com/:f:/g/personal/w0398409_yccd_edu/EocBzftzGAZFh3XGucXIl6wBC7MJgZHn3872L6NNnIJ9Kg?e=0I6zWd
Yuba College, Electrical Distribution System, Thermography Survey and Repairs in 2024/2025:
https://goyccd-my.sharepoint.com/:f:/g/personal/w0398409_yccd_edu/Em6lXuFMeBBGkZthVqKQoOkBUUZ_YKnEKb_aj2dbqWAnmw?e=LkaADv
Addendum No. 1:
Addendum No. 1, RFP 25-09 PDF Format Addendum No. 1, RFP 25-09 MS Word Format
Addendum No. 1, RFP 25-09 PDF Format
Request for Proposals RFP No. 25-08 Yuba College, Grounds Irrigation Tank Replacement Status: Proposals Due July 15, 2025, 1:00PM Sharp
RFP 25-08 YC Irrigation Tank Replacement MS Word Format
RFP 25-08 YC Irrigation Tank Replacement PDF Format
PICTURES_Yuba College Failed Irrigation Tank, South Side of Building 600
Optional Pre-Bid In-Person Login Sheet:
Login Sheet, RFP 25-08 YC Irrigation Tank Replacement
Original Tank Fabrication Manufacturer Contact Information:
“sam@hansentank.com” <sam@hansentank.com>
Fire Water Loop Piping Upgrade with some underground utilities shown link:
https://goyccd-my.sharepoint.com/:f:/g/personal/w0398409_yccd_edu/Es_LrCuRwDJGlinq9r2PI2cBxP2BL67NcDMuKHdmF8P7-g?e=KeSSVE
Addendum No. 1, revision 2 Link: (revised 7/08/2025)
Addendum No.1, RFP 25-08 YC Irrigation Tank Replacement, Revision 2
Addendum No.1, RFP 25-08 YC Irrigation Tank Replacement, Revision 2, PDF Format
Addendum No. 2: District now is requiring DSA submission of Design drawings and Calculations by a licensed Architect or Engineer in California as part of the project.
Addendum No.2, RFP 25-08 YC Irrigation Tank Replacement
Addendum No.2, RFP 25-08 YC Irrigation Tank Replacement, PDF Format
Request for Proposals RFP No. 25-07a WCC Synthetic (AstroTurf AT) Soccer Field Project: Construction Services Status: Evaluation Phase
Proposals are requested from the three designated manufacturers (AstroTurf, Field Turf, and Shaw) with certified installation General contractors an “A” or “B” California Contractor License to complete all of the scope of work per the DSA approved drawings and specifications. This is a DSA prevailing wage project.
-
- Clarifications:
Only the three specified Manufacturers, AstroTurf, Field Turf, and Shaw (with associated General Contractors) Firms that are pre-qualified will then have their proposals considered for this project. The District is only accepting proposals through the three specified synthetic turf manufacturers per Request for proposals numbered RFP 25-07a (AstroTurf), RFP 25-07b (Field Turf), and RFP 25-07c (Shaw). No other alternatives or “equal’s” will be considered representing any other manufacturers. The District intends to award a single contract to the selected Turf Company through a Joint Power Authority (JPA) Program, such as Sourcewell, Omnia, or equivalent acceptable public purchasing program. Contractors may submit multiple proposals to each of the three Turf Manufacturers.
Proposal Requirements:
The procurement process required the Turf Manufacturers to provide the proposals per RFP No. 25-07a, b, and c; Addendum No. 1 and 3 (reference documents). These documents made clear that bids would only be accepted from one of three pre-qualified Turf Manufacturers. These documents did not permit a general contractor to submit a bid on its own or on behalf of or in conjunction with a Turf Manufacturer.
Addendum No. 1:
“This project is proposed to be procured through a joint power authority program (JPA) such as a “Sourcewell”, Omnia, or equivalent (as stated at the bottom of page 4 in the RFP). The turf vendors will be the ones providing a proposal for not only the synthetic turf portion of the project but the project as a whole, including all trades/contractors needed to construct the whole facility. Each vendor will only provide pricing for their specified product in the RFP with their name on it, and pricing to construct/complete the entire project.”
Addendum No. 3:
“Only the three specified Manufacturers, AstroTurf, Field Turf, and SHAW (with associated General Contractors) Firms that are pre-qualified will then have their proposals considered for this project. The District is only accepting proposals through the three specified synthetic turf manufacturers per Request for proposals numbered RFP 25-07a (AstroTurf), RFP 25-07b (Field Turf), and RFP 25-07c (SHAW). No other alternatives or “equal’s” will be considered representing any other manufacturers. The District intends to award a single contract to the selected Turf Company through a Joint Power Authority (JPA) Program, such as “Sourcewell”, Omnia, or equivalent acceptable public purchasing program. Contractors may submit multiple proposals to each of the three Turf Manufacturers.”
Although proposals are requested utilizing the Joint Powers of Authority (JPA) program, this is still also a CUPCCAA project. All General Contractors submitting proposals to the Turf Manufacturers are required to be on the District’s CUPCCAA list of qualified contractors. Contractors can submit the required CUPCCAA form to the District by accessing the form at this web page link, filling it out and submitting it to the District:
https://www.yccd.edu/district-services/fiscal-services/purchasing-2/cupccaa/
RFP 25-07a WCC Soccer Field Construction – AT v2 Final
RFP 25-07a WCC Soccer Field Construction – AT v2 Final PDF Format
Link to RFP’s:
https://goyccd-my.sharepoint.com/:f:/g/personal/w0398409_yccd_edu/En1zMJ24cINJqNU0XqwYWpQBJXJ6WUM-F_tbg88P3hJ5cg?e=xkRBIR
Link to DSA Approved Drawings and Specifications:
https://goyccd-my.sharepoint.com/:f:/g/personal/w0398409_yccd_edu/EhKSo_ihjnFDjWsqiMv53SIBgwylPR-O55rPa8EVZjO66Q?e=lJcxgT
Link to Division 0 Specifications:
https://goyccd-my.sharepoint.com/:f:/g/personal/w0398409_yccd_edu/EgacbyMneCVKlstOJrqz4PUBVii4th3TuFtNx79JX1_KTA?e=nw9Bxj
Optional Pre-Bid Sign-In Sheet:
Log Sheet Optional Pre-Bid Meeting RFP 25-07a, b, c 4.25.2025
Addendum No. 1:
01_RFP No. 25-07a, b, and c_Addendum No.1
01_RFP No. 25-07a, b, and c_Addendum No.1
Addendum No. 2: Pre-Bid Meeting 4/25 at 1pm
02_RFP No. 25-07a, b, and c_Addendum No.2
Log Sheet Optional Pre-Bid Meeting RFP 25-07a, b, c 4.25.2025
Addendum 3 version 3.0:
03_RFP No. 25-07a, b, and c_Addendum No.3 v3 03_RFP No. 25-07a, b, and c_Addendum No.3 v3
03_RFP No. 25-07a, b, and c_Addendum No.3 v3 PDF Format
DSA Addendum 1 (Part of Addendum No. 3) Link:
https://goyccd-my.sharepoint.com/:f:/g/personal/w0398409_yccd_edu/EooYMNdUxQ1BnJI-e42JOHoBu9Y-tsL-DHOycYTCdwoKNg?e=n4g9gT
Contractors can submit the required CUPCCAA form to the District by accessing the form at this web page link, filling it out and submitting it to the District:
https://www.yccd.edu/district-services/fiscal-services/purchasing-2/cupccaa/
The Geotechnical Report is in the following Link:
All modified/updated Division 0 specifications ( Specifications 00 11 16, Invitation to Bidders; 00 21 13 Clarifications — Bid Requirements Checklist v3; 00 41 00 Bid Form v3.0) are located in this shared folder link:
https://goyccd-my.sharepoint.com/:f:/g/personal/w0398409_yccd_edu/EoBuacObtClPqLRuyyFQuZAB-VkOHKqghQz47pjosk6_Og?e=2FlZpx
Request: Please review carefully the RFP, Specifications, Drawings, and Addendums. Although a Clarifications–Bid Requirements Checklist is provided, please review everything carefully to ensure that your proposal is complete and provides everything requested.
Addendum No. 4:
04_RFP No. 25-07a, b, and c_Addendum No.4 v4 PDF Format
Addendum No. 5:
05_RFP No. 25-07a, b, and c_Addendum No.5
Proposals Tabulation Sheet:
ProposalsTabulation Sheet–RFP 25-07a, b, c – signed
Request for Proposals RFP No. 25-07b WCC Synthetic (Field Turf FT) Soccer Field Project: Construction Services; Status: Proposals Being Evaluated.
Proposals are requested from the three designated manufacturers (AstroTurf, Field Turf, and Shaw) with certified installation General contractors an “A” or “B” California Contractor License to complete all of the scope of work per the DSA approved drawings and specifications. This is a DSA prevailing wage project.
-
- Clarifications:
Only the three specified Manufacturers, AstroTurf, Field Turf, and Shaw (with associated General Contractors) Firms that are pre-qualified will then have their proposals considered for this project. The District is only accepting proposals through the three specified synthetic turf manufacturers per Request for proposals numbered RFP 25-07a (AstroTurf), RFP 25-07b (Field Turf), and RFP 25-07c (Shaw). No other alternatives or “equal’s” will be considered representing any other manufacturers. The District intends to award a single contract to the selected Turf Company through a Joint Power Authority (JPA) Program, such as Sourcewell, Omnia, or equivalent acceptable public purchasing program. Contractors may submit multiple proposals to each of the three Turf Manufacturers.
Proposal Requirements:
The procurement process required the Turf Manufacturers to provide the proposals per RFP No. 25-07a, b, and c; Addendum No. 1 and 3 (reference documents). These documents made clear that bids would only be accepted from one of three pre-qualified Turf Manufacturers. These documents did not permit a general contractor to submit a bid on its own or on behalf of or in conjunction with a Turf Manufacturer.
Addendum No. 1:
“This project is proposed to be procured through a joint power authority program (JPA) such as a “Sourcewell”, Omnia, or equivalent (as stated at the bottom of page 4 in the RFP). The turf vendors will be the ones providing a proposal for not only the synthetic turf portion of the project but the project as a whole, including all trades/contractors needed to construct the whole facility. Each vendor will only provide pricing for their specified product in the RFP with their name on it, and pricing to construct/complete the entire project.”
Addendum No. 3:
“Only the three specified Manufacturers, AstroTurf, Field Turf, and SHAW (with associated General Contractors) Firms that are pre-qualified will then have their proposals considered for this project. The District is only accepting proposals through the three specified synthetic turf manufacturers per Request for proposals numbered RFP 25-07a (AstroTurf), RFP 25-07b (Field Turf), and RFP 25-07c (SHAW). No other alternatives or “equal’s” will be considered representing any other manufacturers. The District intends to award a single contract to the selected Turf Company through a Joint Power Authority (JPA) Program, such as “Sourcewell”, Omnia, or equivalent acceptable public purchasing program. Contractors may submit multiple proposals to each of the three Turf Manufacturers.”
Although proposals are requested utilizing the Joint Powers of Authority (JPA) program, this is still also a CUPCCAA project. All General Contractors submitting proposals to the Turf Manufacturers are required to be on the District’s CUPCCAA list of qualified contractors. Contractors can submit the required CUPCCAA form to the District by accessing the form at this web page link, filling it out and submitting it to the District:
https://www.yccd.edu/district-services/fiscal-services/purchasing-2/cupccaa/
RFP 25-07b WCC Soccer Field Construction – Field Turf (FT) v2.0 final
RFP 25-07b WCC Soccer Field Construction – Field Turf (FT) v2.0 final PDF Format
Link to RFP’s:
https://goyccd-my.sharepoint.com/:f:/g/personal/w0398409_yccd_edu/En1zMJ24cINJqNU0XqwYWpQBJXJ6WUM-F_tbg88P3hJ5cg?e=xkRBIR
Link to DSA Approved Drawings and Specifications:
https://goyccd-my.sharepoint.com/:f:/g/personal/w0398409_yccd_edu/EhKSo_ihjnFDjWsqiMv53SIBgwylPR-O55rPa8EVZjO66Q?e=lJcxgT
Link to Division 0 Specifications:
https://goyccd-my.sharepoint.com/:f:/g/personal/w0398409_yccd_edu/EgacbyMneCVKlstOJrqz4PUBVii4th3TuFtNx79JX1_KTA?e=nw9Bxj
Optional Pre-Bid Sign-In Sheet:
Log Sheet Optional Pre-Bid Meeting RFP 25-07a, b, c 4.25.2025
Addendum No. 1:
01_RFP No. 25-07a, b, and c_Addendum No.1
01_RFP No. 25-07a, b, and c_Addendum No.1
Addendum No. 2: Pre-Bid Meeting 4/25 at 1pm
02_RFP No. 25-07a, b, and c_Addendum No.2
Log Sheet Optional Pre-Bid Meeting RFP 25-07a, b, c 4.25.2025
Addendum 3 version 3.0:
03_RFP No. 25-07a, b, and c_Addendum No.3 v3 03_RFP No. 25-07a, b, and c_Addendum No.3 v3
03_RFP No. 25-07a, b, and c_Addendum No.3 v3 PDF Format
DSA Addendum 1 (Part of Addendum No. 3) Link:
https://goyccd-my.sharepoint.com/:f:/g/personal/w0398409_yccd_edu/EooYMNdUxQ1BnJI-e42JOHoBu9Y-tsL-DHOycYTCdwoKNg?e=n4g9gT
Contractors can submit the required CUPCCAA form to the District by accessing the form at this web page link, filling it out and submitting it to the District:
https://www.yccd.edu/district-services/fiscal-services/purchasing-2/cupccaa/
The Geotechnical Report is in the following Link:
All modified/updated Division 0 specifications ( Specifications 00 11 16, Invitation to Bidders; 00 21 13 Clarifications — Bid Requirements Checklist v3; 00 41 00 Bid Form v3.0) are located in this shared folder link:
https://goyccd-my.sharepoint.com/:f:/g/personal/w0398409_yccd_edu/EoBuacObtClPqLRuyyFQuZAB-VkOHKqghQz47pjosk6_Og?e=2FlZpx
Request: Please review carefully the RFP, Specifications, Drawings, and Addendums. Although a Clarifications–Bid Requirements Checklist is provided, please review everything carefully to ensure that your proposal is complete and provides everything requested.
Addendum No. 4:
04_RFP No. 25-07a, b, and c_Addendum No.4 v4 PDF Format
Addendum No. 5:
05_RFP No. 25-07a, b, and c_Addendum No.5
Proposals Tabulation Sheet:
ProposalsTabulation Sheet–RFP 25-07a, b, c – signed
Request for Proposals RFP No. 25-07c WCC Synthetic (Shaw) Soccer Field Project: Construction Services: Status: Proposals Being Evaluated.
Proposals are requested from the three designated manufacturers (AstroTurf, Field Turf, and Shaw) with certified installation General contractors an “A” or “B” California Contractor License to complete all of the scope of work per the DSA approved drawings and specifications. This is a DSA prevailing wage project.
-
- Clarifications:
Only the three specified Manufacturers, AstroTurf, Field Turf, and Shaw (with associated General Contractors) Firms that are pre-qualified will then have their proposals considered for this project. The District is only accepting proposals through the three specified synthetic turf manufacturers per Request for proposals numbered RFP 25-07a (AstroTurf), RFP 25-07b (Field Turf), and RFP 25-07c (Shaw). No other alternatives or “equal’s” will be considered representing any other manufacturers. The District intends to award a single contract to the selected Turf Company through a Joint Power Authority (JPA) Program, such as Sourcewell, Omnia, or equivalent acceptable public purchasing program. Contractors may submit multiple proposals to each of the three Turf Manufacturers.
Proposal Requirements:
The procurement process required the Turf Manufacturers to provide the proposals per RFP No. 25-07a, b, and c; Addendum No. 1 and 3 (reference documents). These documents made clear that bids would only be accepted from one of three pre-qualified Turf Manufacturers. These documents did not permit a general contractor to submit a bid on its own or on behalf of or in conjunction with a Turf Manufacturer.
Addendum No. 1:
“This project is proposed to be procured through a joint power authority program (JPA) such as a “Sourcewell”, Omnia, or equivalent (as stated at the bottom of page 4 in the RFP). The turf vendors will be the ones providing a proposal for not only the synthetic turf portion of the project but the project as a whole, including all trades/contractors needed to construct the whole facility. Each vendor will only provide pricing for their specified product in the RFP with their name on it, and pricing to construct/complete the entire project.”
Addendum No. 3:
“Only the three specified Manufacturers, AstroTurf, Field Turf, and SHAW (with associated General Contractors) Firms that are pre-qualified will then have their proposals considered for this project. The District is only accepting proposals through the three specified synthetic turf manufacturers per Request for proposals numbered RFP 25-07a (AstroTurf), RFP 25-07b (Field Turf), and RFP 25-07c (SHAW). No other alternatives or “equal’s” will be considered representing any other manufacturers. The District intends to award a single contract to the selected Turf Company through a Joint Power Authority (JPA) Program, such as “Sourcewell”, Omnia, or equivalent acceptable public purchasing program. Contractors may submit multiple proposals to each of the three Turf Manufacturers.”
Although proposals are requested utilizing the Joint Powers of Authority (JPA) program, this is still also a CUPCCAA project. All General Contractors submitting proposals to the Turf Manufacturers are required to be on the District’s CUPCCAA list of qualified contractors. Contractors can submit the required CUPCCAA form to the District by accessing the form at this web page link, filling it out and submitting it to the District:
https://www.yccd.edu/district-services/fiscal-services/purchasing-2/cupccaa/
RFP 25-07c WCC Soccer Field Construction – Shaw v2.0 Final
RFP 25-07c WCC Soccer Field Construction – Shaw v2.0 Final PDF Format
Link to RFP’s:
https://goyccd-my.sharepoint.com/:f:/g/personal/w0398409_yccd_edu/En1zMJ24cINJqNU0XqwYWpQBJXJ6WUM-F_tbg88P3hJ5cg?e=xkRBIR
Link to DSA Approved Drawings and Specifications:
https://goyccd-my.sharepoint.com/:f:/g/personal/w0398409_yccd_edu/EhKSo_ihjnFDjWsqiMv53SIBgwylPR-O55rPa8EVZjO66Q?e=lJcxgT
Link to Division 0 Specifications:
https://goyccd-my.sharepoint.com/:f:/g/personal/w0398409_yccd_edu/EgacbyMneCVKlstOJrqz4PUBVii4th3TuFtNx79JX1_KTA?e=nw9Bxj
Optional Pre-Bid Sign-In Sheet:
Log Sheet Optional Pre-Bid Meeting RFP 25-07a, b, c 4.25.2025
Addendum No. 1:
01_RFP No. 25-07a, b, and c_Addendum No.1
01_RFP No. 25-07a, b, and c_Addendum No.1
Addendum No. 2: Pre-Bid Meeting 4/25 at 1pm
02_RFP No. 25-07a, b, and c_Addendum No.2
Log Sheet Optional Pre-Bid Meeting RFP 25-07a, b, c 4.25.2025
Addendum 3 version 3.0:
03_RFP No. 25-07a, b, and c_Addendum No.3 v3 03_RFP No. 25-07a, b, and c_Addendum No.3 v3
03_RFP No. 25-07a, b, and c_Addendum No.3 v3 PDF Format
DSA Addendum 1 (Part of Addendum No. 3) Link:
https://goyccd-my.sharepoint.com/:f:/g/personal/w0398409_yccd_edu/EooYMNdUxQ1BnJI-e42JOHoBu9Y-tsL-DHOycYTCdwoKNg?e=n4g9gT
Contractors can submit the required CUPCCAA form to the District by accessing the form at this web page link, filling it out and submitting it to the District:
https://www.yccd.edu/district-services/fiscal-services/purchasing-2/cupccaa/
The Geotechnical Report is in the following Link:
All modified/updated Division 0 specifications ( Specifications 00 11 16, Invitation to Bidders; 00 21 13 Clarifications — Bid Requirements Checklist v3; 00 41 00 Bid Form v3.0) are located in this shared folder link:
https://goyccd-my.sharepoint.com/:f:/g/personal/w0398409_yccd_edu/EoBuacObtClPqLRuyyFQuZAB-VkOHKqghQz47pjosk6_Og?e=2FlZpx
Request: Please review carefully the RFP, Specifications, Drawings, and Addendums. Although a Clarifications–Bid Requirements Checklist is provided, please review everything carefully to ensure that your proposal is complete and provides everything requested.
Addendum No. 4:
04_RFP No. 25-07a, b, and c_Addendum No.4 v4 PDF Format
Addendum No. 5:
05_RFP No. 25-07a, b, and c_Addendum No.5
Proposals Tabulation Sheet:
ProposalsTabulation Sheet–RFP 25-07a, b, c – signed
Request for Proposals RFP No. 25-06 WCC Soccer Field Project: Structural Inspections and Testing Services; Status: Awarding Phase
RFP 25-06 WCC Synthetic Soccer Field Project, Struct. Spec. Inspect and Tests MS Word Format
RFP 25-06 WCC Synthetic Soccer Field Project, Struct. Spec. Inspect and Tests PDF Format
Link to DSA Approved Drawings and Specifications:
https://goyccd-my.sharepoint.com/:f:/g/personal/w0398409_yccd_edu/EhKSo_ihjnFDjWsqiMv53SIBgwylPR-O55rPa8EVZjO66Q?e=lJcxgT
DSA Form 103 Link:
https://goyccd-my.sharepoint.com/:f:/g/personal/w0398409_yccd_edu/EuiY7dtRlJVKkhl34kR03HABFLtbzeuDqRxTEJQAUGtW9g?e=CbOGne
Login Sheet RFP 25-06 Optional Pre-Bid Mtg. Struct. Insp.
ProposalsTabulation Sheet–RFP 25-06 signed
Request for Proposals RFP No. 25-05 Yuba College, Building 1100 (Library) Restoration and General Contractors Services Needed, Project: Small Fire and Water Damage Repairs and Restoration Project ; Status: Awarded
RFP 25-05 YC Building 1100 Library Fire, Water Damage Reconstruction Project MS Word Format v1
RFP 25-05 YC Building 1100 Library Fire, Water Damage Reconstruction Project PDF Format v1
Link to Damaged Area Pictures:
https://goyccd-my.sharepoint.com/:f:/g/personal/w0398409_yccd_edu/EtU37ctBQsFAvMC04Mhc290BRGijMFvx4yFSkDnrHhgg7g?e=ENNkQD
There is an optional pre-bid zoom meeting link and a requirement for one of two mandatory on campus meetings listed in the RFP.
RFP 25-05 Mandatory Pre-Bid Meeting 03.27.2025
Login Sheet RFP 25-05 Mandatory Pre-Bid Meeting 04_03_2025
RFP No. 25-05 YC Building 1100 Library Repairs and Restoration Project_Addendum No.1
ProposalsTabulation Sheet–RFP 25-05 YC 1100
Request for Proposals RFP No. 25-04 Woodland Community College, Architectural Services, College Metal Storage Building ; Status: Awarded
RFP 25-04 WCC College Metal Storage Building–Architectural Services MS Word Format
RFP 25-04 WCC College Metal Storage Building–Architectural Services PDF Format
Login Sheet RFP 25-04 Mandatory Mtg WCC Stor.Bld-Arch. 3.26.2025
ProposalsTabulation Sheet–RFP 25-04 WCC College Metal Building AE Services – signed
Request for Proposals RFP No. 25-03 YCCD New Cell Towers (up to 4) ; Status: Proposals Due: Failed Procurement. The District did not receive any proposals June 10, 2025.
RFP 25-03 YCCD New Cell Phone Towers, MS Word Format
RFP 25-03 YCCD New Cell Phone Towers, PDF Format
Agreement for Services Link:
https://goyccd-my.sharepoint.com/:w:/g/personal/w0398409_yccd_edu/EW3eZniBz3RJgE9QajoFm2cB4FL7Igq6kiPq-eY3jq-stw?e=qCQUB1
April 9, 2025: 10:00AM to 12:00pm Noon Optional On-Campus Pre-Bid Meeting: Meet first in building 100, room 113, then, tour potential cell tower locations. Address: Woodland Community College, 2300 East Gibson Road, Woodland, California 95776.
April 9, 2025: 1:30PM to 2:30PM Optional On Campus Pre-Bid Meeting, Meet in the lobby at the Colusa County Center. Address: Colusa County Center: 99 Elis Street, Williams, California 95987
April 11, 2025: 10:00AM to 12:00pm Noon Optional On-Campus Pre-Bid Meeting: Meet first in building 100 lobby, then, tour potential cell tower locations. Address: Lake County Campus, 15880 Dam Road Extension, Clear Lake, California 95422
April 16, 2025: 11:00AM to 12:00pm Noon Optional On-Campus Pre-Bid Meeting: Meet first in room 211, then, tour potential cell tower locations. Address: Sutter County Campus, 3301 East Onstott Road, Yuba City, California 95991
Login Sheet Optional Pre-Bid Meeting RFP 25-03 Cell Towers WCC
Request for Proposals RFP No. 25-01 Yuba Community College District College, Independent Audit Services; Status: Awarded.
RFP 25-01 Independent Audit Services